How should field change orders (FCOs) be handled within CQM?

Ignore scope changes to avoid delays.

Document scope changes, update drawings/specs, adjust QC plan/ITP, and verify revised work meets criteria.

Field change orders must be managed through formal change control in CQM. When a field change arises, capture the new scope and the reason for the change, then update all affected documentation. This includes revising drawings and specifications to reflect the altered work, and adjusting the Quality Control Plan and the ITP so the inspection and testing requirements match the updated criteria. After implementing the change, reverify that the revised work meets the acceptance criteria, which may involve additional inspections, tests, or special QC checks. It’s essential to obtain the proper approvals, and to update schedules, costs, and as-built records accordingly. Keeping thorough records of the FCO, updated drawings, revised QC plan/ITP, and test results helps ensure the change is traceable and compliant.

Other approaches fall short because they bypass the formal control process and can create quality, safety, or contractual issues: ignoring scope changes risks unverified work and misaligned expectations; reassigning work to another contractor without approvals bypasses accountability and QC requirements; and issuing a new contract for field changes is unnecessary and disruptive, since changes should be integrated within the existing contract through proper change management.

Reassign the work to another contractor without approvals.

Issue a new contract without field changes.

Next question

Find the option that is right for you!

All options are one-time payments.

$12.50

30 day premium pass

All the basics to get you started

  • Ad-free experience
  • View your previous attempt history
  • Mobile app access
  • In-depth explanations
  • 30 day premium pass access
👑$30.00 $87.50 usd

6 month DELUXE pass (most popular)

Everything with the 30 day premium pass FOR 6 MONTHS! & the ultimate digital PDF study guide (BONUS)

  • Everything included in the premium pass
  • $87.50 usd value for $30.00! You save $57.50!
  • + Access to the ultimate digital PDF study guide
  • + 6 months of premium pass access
  • + Priority support
$12.50 $18.99

Ultimate digital PDF study guide

For those that prefer a more traditional form of learning

  • Available for instant download
  • Available offline
  • Hundreds of practice multiple choice questions
  • Comprehensive content
  • Detailed explanations
Image Description
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy